| 1.5 Barrel Steam Heated
(3 Vessel), All Grain Brewery |
| 54 Barrels per year per
fermenter - 10 day brewing cycle |
| 1.5 U.S. Barrels = 46.5
U.S. Gallons = 175 Liters |
| DESCRIPTION |
QTY. |
EACH |
| 300,000 BTU Steam Generator with condensate return
system. |
1 |
3705 |
| 55 Gallon Stainless Steel (SS) Brew Kettle - 23"Dx35"H, |
2 |
1600 |
| internal copper steam coil1.5" triclamp Drain
with butterfly |
| valve, (2) thermometer wells, thermometer, 24"x24"x18"H |
| metal stand - Manual Control |
| 55 Gallon SS Mash/Lauter Tun - 23"Dx35"H, |
1 |
1600 |
| Copper Slotted Bottom (.046"x.3125"slots),1.5"
triclamp |
| Drain with ball valve, thermometer well, thermometer |
|
| Barrel Carrier/Dumper for Lauter Tun |
1 |
420 |
| 1/2HP #5 Pump with cart - 1.5" inlet Triclover
fittings |
1 |
1325 |
| 1/25HP Bronze recirculating pumps with hose, triclamp
adapters |
2 |
195 |
| 5GPM Plate heat exchanger |
1 |
1950 |
| 25' 1" Brewery Hose and (6) fittings |
1 |
280 |
| Oxygenation System, Elbow, Site Glass, Air Stone,
Tee, Therm. |
1 |
702 |
| Charcoal Water Filter System |
1 |
650 |
| 1/2HP Glycol system- 26 Gallon Tank - with 2 circulating
pumps |
1 |
2961 |
| 1.5BBL - Conical Fermenter - 33"Dia. X 66"H. -
70degree cone - |
1 |
4400 |
| 60 Gallon capacity, All 304 Stainless Steel (SS)
construction, |
| #2 interior with interior welds finished to #4
Chlorine free |
| fiberglass Insulation and #4 SS exterior jacket,
Cone & (2) |
| Side Glycol Jackets - rated to 15PSI, (3) legs
with casters, |
| Top manway, Adjustable racking arm, sample port,
C.I.P. |
| Ball, down tube, CO2 Valve & Gauge, (2) Thermometer
wells, |
| (1) Thermometer, (2) 1" SS Butterfly Valves, 1.5"
Elbow, |
| (7) tri-clamps and gaskets. |
| 200mmx200mm Plate & Frame Beer Filter with
pump |
1 |
1495 |
| Subtotal Total |
$23,078.00 |
| Options |
| Additional 1.5BBL - Conical Fermenter - (as above) |
1
|
$4,400.00 |
| 5 USGallon - ball lock - Cornelius Kegs |
24
|
$35.00 |
| Keg Cleaning Manifold - works with Brew Kettle
and Pump |
1
|
$1,295.00 |
| Keg Filling Station |
1
|
$195.00 |
| Optional Electronic Boiler/ Fermenter Control
Panel - |
1
|
$3,575.00 |
| (1) automatic hi/lo boiler/mash control, (1) Hot
Liquor control, |
| (1)Lauter Monitor (2)Fermenter controls |
| Draft System - (2) dual gauge CO2 regulator, gage
protector, |
1
|
$340.00 |
| 3way manifold, (6) gas fittings, (6) beverage
fittings, (6) picnic |
| faucets, (25') each of gas and beverage tubing,
Crimp rings, |
| Crimpers, tubing cutter |
| Grand Total |
$32,918.00 |